top of page

Log Book

Design studio 1(IBEHS 1P10A C01) 

Date: Wednesday, September 18th, 2019 

  • Gathering with group members

  • Introduction to DP1 

  • Assigning roles (administrator, coordinator, etc)

  • Assigning responsibilities for the upcoming 4 weeks of the project  (note taker, chair)

  • Collaborative discussion about the case study

  • Asking questions from the guest speakers

  • Note taker: Negar Goodarzynejad 

  • Chair: Katie DeMelo

  • Alternate: Christina Negus

  • Outcomes: Milestone 1’s components were completed and submitted. 

 

Design studio 2(IBEHS 1P10A C01)

Date: Wednesday, September 25th, 2019 

  • Everyone came prepared with their individual research parts

  • Katie and Michelle had researched about forms and functions. 

  • Christina was in charge of user and device interactions.

  • Negar had researched about materials.

  • All ideas were shared respectfully and the best ones were further elaborated upon to incorporate in the design solution 

  • Notes were jotted down on a white board

  • Note taker: Michelle Quong

  • Chair: Christina Negus

  • Alternate: Katie DeMelo

  • Outcomes: Stages 2 and 3 of Milestone 2 were completed. 

 

Design Studio 3

Date: Wednesday, October 2nd, 2019

  • Notetaker: Katie DeMelo

  • Chair: Negar Goodarzynejad

  • Alternate: Michelle Quong

  • Milestone 3 which consisted of Design configuration and Preliminary Prototyping was completed 

 

Design Studio 4

Date: Wednesday, October 9th, 2019

  • Everyone was present

  • Katie worked on designing the screw and thread mechanism of the low-fidelity prototype

  • Christina worked on sewing the bag for the low-fidelity prototype

  • Negar and Michelle worked on the written proposal

 

3D Printing of the screw and thread mechanism

Thursday, October 10th,2019

  • Katie went to the design studio, on her own time, to print the material

 

 

Picking up of the 3D parts

Date: Friday, October 11th, 2019

  • Everyone met at the design studio to pick up the screw and thread mechanism parts

  • Unfortunately, the printing was not done properly and only the base part was almost completed

  • Since everyone had to leave for the reading week, we decided to come up with a new idea for the closing structure of the skin barrier  

 

Reading Week

Date: October 12th, 2019- October, 19th, 2019

  • During the break, everyone collaboratively worked on the written proposal document

  • Any questions or concerns were asked in either the messenger or iMessage group chats from other team members

  • Michelle took the parts of the low fidelity prototype with her and assembled and glued the parts together. She consulted and asked questions in the groupchat during this process. 

  •  

 

 

  • Everyone worked on their 3 min thesis on their own time as the presentation is done and graded individually 

 

Written Proposal and Slide deck

Thursday, October 17th, 2019

  • Everyone got online at the same time to work on the written proposal

  • Each person had a section to complete 

    • Katie: Introduction and Statement of problem

    • Michelle: Background Research Summary + Appendix

 

  • Christina: Description of the design

  • Negar: Justification of the design

 

  • Negar made the draft of the slide deck and everyone else modified it afterwards

 

  • Everyone completed their written parts 

 

Final in-person meeting

Sunday, October 20th, 2019

  • Everyone met at PGCL’s study room to work on the remainder of the project

  • The written proposal was proofread

  • The figures and appendices were added and completed

  • The slide deck was finalized

  • The 60 second discriptary video was recorded  

  • Outcomes: The written proposal, video, and slide deck were all submitted to Avenue

 

Modification made to the Written Proposal

Monday, October 21st, 2019

  • We were informed in the lecture that a table of contents is needed since the written proposal lacked this section, Negar made the draft of the written proposal, everyone else modified and confirmed it, and Christina submitted it 

  • Outcome: Resubmission of the written Proposal